• Rapid curing system which can be overcoated in 45 minutes, and is fully cured within 65 minutes at 20 °C/ 68 °F
• Cartridge packaging eases in-situ repair
• Can be perfectly contoured, and removes the need for sanding, therefore simplifying the application process
• Single product, suitable for use between 5-40 °C/ 41-104 °F, and up to 85% RH
• Low hazard and 100% solids. Cartridge format avoids the need to handle and mix individual components
• Specifically designed for leading edge protection, a combination of Belzona 5711 and Belzona 5721 can repair damage, and offer long lasting protection against rain erosion and impact damage